Title 17 LAND USE
Chapter 17.108 FLOOD HAZARD AREA REGULATIONS
17.108.120 Development permit--Established.
A Development Permit shall be obtained before construction,
development or substantial improvement begins within any area of special flood
hazard established in
Section 17.108.070. Application for a Development Permit
shall be made on forms furnished by the Pueblo County Zoning Administrator and
may include, but not be limited to: plans in duplicate drawn to scale by a
licensed architect, registered professional engineer, or registered professional
land surveyor, showing the nature, location, dimensions and elevations of the
area in question; existing or proposed structures, fill, storage of materials,
drainage facilities; and the location of the foregoing.
Specifically, the following information is
required:
A. Elevation in relation to mean sea level, of the lowest
floor (including basement) of all structures;
B. Elevation in relation to mean sea level to which any
structure will be floodproofed;
C. Certification by a registered professional engineer or
architect that the floodproofing methods for any nonresidential structure meet
the floodproofing criteria in
Section 17.108.160(B)(2) and,
D. Description of the extent to which any watercourse will be
altered or relocated as a result of proposed development.
An application fee as established by the Board by resolution
shall be paid at the time application is made.